Equestrian site stays open in the winter months in Hampshire
06th Mar 2023Gridforce IR35 installed in September 2022 and photograph taken in March 2023. Read More
Over 1000m2 Gridforce GF50 installed at the newly opened Sea Lanes Brighton, the UK’s first National Open Water Swimming Centre. This project, respectful and adjacent to the Grade II Maderia Terraces on Brighton seafront, provides access to people of all abilities whilst being sympathetic to the local area and being compliant with Sustainable Urban Drainage (SUDs). This area has brought a derelict site back to life from starting its journey, entering a Brighton and Hove council’s competition in February 2015, to opening on 2nd June 2023.
Gridforce IR35 installed in September 2022 and photograph taken in March 2023. Read More
Installed at Bellahouston Park in winter 2021/22 by Fairways Group at Inchinnan. A total area of 9500m2 was installed for the live music events… Read More
installed by Pinnacle Groundworks Ltd January 2021 730m2 The car park was installed with Gridforce GF30 and demarcation blocks to mark out… Read More